Strategic capital budgeting: asset replacement under market uncertainty

Research output: Contribution to Journal/MagazineJournal articlepeer-review

Published
<mark>Journal publication date</mark>10/2003
<mark>Journal</mark>OR Spectrum
Issue number4
Volume25
Number of pages37
Pages (from-to)443-479
Publication StatusPublished
<mark>Original language</mark>English

Abstract

In this paper the impact of product market uncertainty on the optimal replacement timing of a production facility is studied. The existing production facility can be replaced by a technologically more advanced and thus more cost-effective one. We take into account strategic interactions among the firms competing in the product market by analyzing the problem in a duopolistic setting. We calculate the value of each firm and show that i) a preemptive (simultaneous) replacement occurs when the associated sunk cost is low (high), ii) despite the preemption effect uncertainty always raises the expected time to replace, and iii) the relationship between the probability of optimal replacement within a given time interval and uncertainty is decreasing for long time intervals and humped for short time intervals. Furthermore it is shown that result ii) carries over to the case where firms have to decide about starting production rather than about replacing existing facilities.