12,000

We have over 12,000 students, from over 100 countries, within one of the safest campuses in the UK

93%

93% of Lancaster students go into work or further study within six months of graduating

Home > Research > Publications & Outputs > Design management from a contractor's perspecti...
View graph of relations

« Back

Design management from a contractor's perspective : the need for clarity.

Research output: Contribution to journalJournal article

Published

Journal publication date2007
JournalArchitectural Engineering and Design Management
Journal number1
Volume3
Number of pages12
Pages17-28
Original languageEnglish

Abstract

Over the past 40 years, a concern with the adoption of business methods to support successful design development has emerged. Design management as a discipline addresses such concern through two central schools of thought. The first focuses on organizing the design firm, and the second aims to better understand the design process (its nature, stages and activities) and to propose improved communication and coordination mechanisms. Both schools of thought have taken essentially a design professional’s perspective to analyse design. Nevertheless, the recent adoption of procurement routes in which contractors are responsible for design, construction and facilities management has imposed on contractors the need to manage design to maintain competitiveness. This paper presents results from two case studies investigating the contractor’s role in managing the design process. Research results are presented in terms of the problems contractors face in managing design, the necessity for appropriate design management and the skills contractors believe are required for effective design management. The paper concludes by advocating a need for clarity in the definition of design management from a contractor’s perspective.