Evaluation of Ramp Metering on the M3/M27 and the potential benefits of predictive and linked control optimized for queue constraints.

Research output: Contribution to conferenceConference paper

Published

Publication date2007
Original languageEnglish

Conference

ConferenceWorkshop on Ramp Metering in Europe: The EURAMP Project
CityParis
Period1/01/00 → …

Abstract

Data for the M3/M27 ramp metering pilot scheme (near Southampton in the UK) were analysed to identify the benefits of the existing control measures; and to develop macroscopic and microscopic simulation models. These were subsequently used to investigate the potential of a new approach to ramp metering, based on the latest developments in state space and predictive control theory. The results demonstrate that the widely applicable algorithm developed, incorporating more advanced queue regulation, has the potential to reduce queue lengths and on-ramp waiting times, whilst still maintaining the overall travel time savings already demonstrated.