Home > Research > Publications & Outputs > GLUE based assessment on the overall prediction...

Associated organisational unit

View graph of relations

GLUE based assessment on the overall predictions of a MIKE SHE application.

Research output: Contribution to Journal/MagazineJournal articlepeer-review

Published

Standard

GLUE based assessment on the overall predictions of a MIKE SHE application. / Vazquez, R.; Beven, Keith J.; Feyen, J.
In: Water Resources Management, Vol. 23, No. 7, 05.2009, p. 1325-1349.

Research output: Contribution to Journal/MagazineJournal articlepeer-review

Harvard

Vazquez, R, Beven, KJ & Feyen, J 2009, 'GLUE based assessment on the overall predictions of a MIKE SHE application.', Water Resources Management, vol. 23, no. 7, pp. 1325-1349. https://doi.org/10.1007/s11269-008-9329-6

APA

Vancouver

Vazquez R, Beven KJ, Feyen J. GLUE based assessment on the overall predictions of a MIKE SHE application. Water Resources Management. 2009 May;23(7):1325-1349. doi: 10.1007/s11269-008-9329-6

Author

Vazquez, R. ; Beven, Keith J. ; Feyen, J. / GLUE based assessment on the overall predictions of a MIKE SHE application. In: Water Resources Management. 2009 ; Vol. 23, No. 7. pp. 1325-1349.

Bibtex

@article{f59244acba3943dc83f08a42bd635397,
title = "GLUE based assessment on the overall predictions of a MIKE SHE application.",
abstract = "The generalised likelihood uncertainty estimation (GLUE) approach was applied to assess the performance of a distributed catchment model and to estimate prediction limits after conditioning based on observed catchment-wide streamflow. Prediction limits were derived not only for daily streamflow but also for piezometric levels and for extreme events. The latter analysis was carried out considering independent partial duration time series (PDS) obtained from the observed daily streamflow hydrograph. Important data uncertainties were identified. For streamflow the stage-discharge data analysis led to estimate an average data uncertainty of about 3 m3 s − 1. For piezometric levels, data errors were estimated to be in the order of 5 m in average and 10 m at most. The GLUE analysis showed that most of the inspected parameters are insensitive to model performance, except the horizontal and vertical components of the hydraulic conductivity of one of the geological layers that have the most influence on the streamflow model performance in the application catchment. The study revealed a considerable uncertainty attached to the simulation of both high flows and low flows (i.e., in average terms 5 m3 s − 1 before the Bayesian updating of the prediction limits). Similarly, wide prediction intervals were obtained for the piezometric levels in relevant wells, in the order of 3.3 and 1.5 m before and after the Bayesian updating of the prediction limits, respectively. Consequently, the results suggest that, in average terms, the model of the catchment predicts overall outputs within the limitations of the errors in the input variables.",
keywords = "MIKE SHE - Likelihood - Uncertainty - Prediction limits - Monte Carlo simulations - GLUE - Partial duration time series - Extreme value analysis - Piezometers",
author = "R. Vazquez and Beven, {Keith J.} and J. Feyen",
year = "2009",
month = may,
doi = "10.1007/s11269-008-9329-6",
language = "English",
volume = "23",
pages = "1325--1349",
journal = "Water Resources Management",
issn = "0920-4741",
publisher = "Springer Netherlands",
number = "7",

}

RIS

TY - JOUR

T1 - GLUE based assessment on the overall predictions of a MIKE SHE application.

AU - Vazquez, R.

AU - Beven, Keith J.

AU - Feyen, J.

PY - 2009/5

Y1 - 2009/5

N2 - The generalised likelihood uncertainty estimation (GLUE) approach was applied to assess the performance of a distributed catchment model and to estimate prediction limits after conditioning based on observed catchment-wide streamflow. Prediction limits were derived not only for daily streamflow but also for piezometric levels and for extreme events. The latter analysis was carried out considering independent partial duration time series (PDS) obtained from the observed daily streamflow hydrograph. Important data uncertainties were identified. For streamflow the stage-discharge data analysis led to estimate an average data uncertainty of about 3 m3 s − 1. For piezometric levels, data errors were estimated to be in the order of 5 m in average and 10 m at most. The GLUE analysis showed that most of the inspected parameters are insensitive to model performance, except the horizontal and vertical components of the hydraulic conductivity of one of the geological layers that have the most influence on the streamflow model performance in the application catchment. The study revealed a considerable uncertainty attached to the simulation of both high flows and low flows (i.e., in average terms 5 m3 s − 1 before the Bayesian updating of the prediction limits). Similarly, wide prediction intervals were obtained for the piezometric levels in relevant wells, in the order of 3.3 and 1.5 m before and after the Bayesian updating of the prediction limits, respectively. Consequently, the results suggest that, in average terms, the model of the catchment predicts overall outputs within the limitations of the errors in the input variables.

AB - The generalised likelihood uncertainty estimation (GLUE) approach was applied to assess the performance of a distributed catchment model and to estimate prediction limits after conditioning based on observed catchment-wide streamflow. Prediction limits were derived not only for daily streamflow but also for piezometric levels and for extreme events. The latter analysis was carried out considering independent partial duration time series (PDS) obtained from the observed daily streamflow hydrograph. Important data uncertainties were identified. For streamflow the stage-discharge data analysis led to estimate an average data uncertainty of about 3 m3 s − 1. For piezometric levels, data errors were estimated to be in the order of 5 m in average and 10 m at most. The GLUE analysis showed that most of the inspected parameters are insensitive to model performance, except the horizontal and vertical components of the hydraulic conductivity of one of the geological layers that have the most influence on the streamflow model performance in the application catchment. The study revealed a considerable uncertainty attached to the simulation of both high flows and low flows (i.e., in average terms 5 m3 s − 1 before the Bayesian updating of the prediction limits). Similarly, wide prediction intervals were obtained for the piezometric levels in relevant wells, in the order of 3.3 and 1.5 m before and after the Bayesian updating of the prediction limits, respectively. Consequently, the results suggest that, in average terms, the model of the catchment predicts overall outputs within the limitations of the errors in the input variables.

KW - MIKE SHE - Likelihood - Uncertainty - Prediction limits - Monte Carlo simulations - GLUE - Partial duration time series - Extreme value analysis - Piezometers

U2 - 10.1007/s11269-008-9329-6

DO - 10.1007/s11269-008-9329-6

M3 - Journal article

VL - 23

SP - 1325

EP - 1349

JO - Water Resources Management

JF - Water Resources Management

SN - 0920-4741

IS - 7

ER -