Home > Research > Publications & Outputs > Optimisation of vessel routing for offshore win...
View graph of relations

Optimisation of vessel routing for offshore wind farm maintenance tasks

Research output: Contribution to conference - Without ISBN/ISSN Abstractpeer-review

Published

Standard

Optimisation of vessel routing for offshore wind farm maintenance tasks. / Kingsman, Toby; Boyacı, Burak.
2019. Abstract from Canadian Operational Research Society 61st Annual Conference, Saskatoon, Saskatchewan, Canada.

Research output: Contribution to conference - Without ISBN/ISSN Abstractpeer-review

Harvard

Kingsman, T & Boyacı, B 2019, 'Optimisation of vessel routing for offshore wind farm maintenance tasks', Canadian Operational Research Society 61st Annual Conference, Saskatoon, Canada, 27/05/19 - 29/05/19.

APA

Kingsman, T., & Boyacı, B. (2019). Optimisation of vessel routing for offshore wind farm maintenance tasks. Abstract from Canadian Operational Research Society 61st Annual Conference, Saskatoon, Saskatchewan, Canada.

Vancouver

Kingsman T, Boyacı B. Optimisation of vessel routing for offshore wind farm maintenance tasks. 2019. Abstract from Canadian Operational Research Society 61st Annual Conference, Saskatoon, Saskatchewan, Canada.

Author

Kingsman, Toby ; Boyacı, Burak. / Optimisation of vessel routing for offshore wind farm maintenance tasks. Abstract from Canadian Operational Research Society 61st Annual Conference, Saskatoon, Saskatchewan, Canada.

Bibtex

@conference{fe39a34d7c1748e190da1b43a5f64da1,
title = "Optimisation of vessel routing for offshore wind farm maintenance tasks",
abstract = "The rapid growth expected in the offshore wind sector means there is an increasing opportunity to find savings from conducting operations and maintenance activities more efficiently. The predicted increase in the size and quantity of offshore wind farms means mathematical tools for scheduling maintenance activities will be necessary to exploit economies of scale fully.Maintenance tasks must be worked on by a specific combination of technicians, equipment and vessel support for a set duration of time. A heterogeneous fleet of vessels is responsible for transporting technicians around the wind farm and conducting personnel transfers. Vessel movements must satisfy any limitations in wind turbine accessibility imposed by offshore weather conditions and the need to return all resources back to port by the end of the shift.In this research, we propose a mathematical model capable of determining the most cost effective routes for vessel movements and the ideal times to undertake crew transfers. The model incorporates a one-to-one pickup and delivery structure between the port and the wind farm and a many-to-many structure within the wind farm. We allow for selective task completion to model instances with restricted resources.We conduct experiments on a mix of simulated and real-life instances from an offshore wind farm. We examine the impact of various instance characteristics such as the task profiles, weather conditions and technicians available on the vessel routes and crew transfer plans.",
author = "Toby Kingsman and Burak Boyacı",
year = "2019",
month = may,
day = "27",
language = "English",
note = "Canadian Operational Research Society 61st Annual Conference, CORS61 ; Conference date: 27-05-2019 Through 29-05-2019",
url = "https://www.cors2019.ca/",

}

RIS

TY - CONF

T1 - Optimisation of vessel routing for offshore wind farm maintenance tasks

AU - Kingsman, Toby

AU - Boyacı, Burak

PY - 2019/5/27

Y1 - 2019/5/27

N2 - The rapid growth expected in the offshore wind sector means there is an increasing opportunity to find savings from conducting operations and maintenance activities more efficiently. The predicted increase in the size and quantity of offshore wind farms means mathematical tools for scheduling maintenance activities will be necessary to exploit economies of scale fully.Maintenance tasks must be worked on by a specific combination of technicians, equipment and vessel support for a set duration of time. A heterogeneous fleet of vessels is responsible for transporting technicians around the wind farm and conducting personnel transfers. Vessel movements must satisfy any limitations in wind turbine accessibility imposed by offshore weather conditions and the need to return all resources back to port by the end of the shift.In this research, we propose a mathematical model capable of determining the most cost effective routes for vessel movements and the ideal times to undertake crew transfers. The model incorporates a one-to-one pickup and delivery structure between the port and the wind farm and a many-to-many structure within the wind farm. We allow for selective task completion to model instances with restricted resources.We conduct experiments on a mix of simulated and real-life instances from an offshore wind farm. We examine the impact of various instance characteristics such as the task profiles, weather conditions and technicians available on the vessel routes and crew transfer plans.

AB - The rapid growth expected in the offshore wind sector means there is an increasing opportunity to find savings from conducting operations and maintenance activities more efficiently. The predicted increase in the size and quantity of offshore wind farms means mathematical tools for scheduling maintenance activities will be necessary to exploit economies of scale fully.Maintenance tasks must be worked on by a specific combination of technicians, equipment and vessel support for a set duration of time. A heterogeneous fleet of vessels is responsible for transporting technicians around the wind farm and conducting personnel transfers. Vessel movements must satisfy any limitations in wind turbine accessibility imposed by offshore weather conditions and the need to return all resources back to port by the end of the shift.In this research, we propose a mathematical model capable of determining the most cost effective routes for vessel movements and the ideal times to undertake crew transfers. The model incorporates a one-to-one pickup and delivery structure between the port and the wind farm and a many-to-many structure within the wind farm. We allow for selective task completion to model instances with restricted resources.We conduct experiments on a mix of simulated and real-life instances from an offshore wind farm. We examine the impact of various instance characteristics such as the task profiles, weather conditions and technicians available on the vessel routes and crew transfer plans.

M3 - Abstract

T2 - Canadian Operational Research Society 61st Annual Conference

Y2 - 27 May 2019 through 29 May 2019

ER -