Home > Research > Publications & Outputs > Organising alignment
View graph of relations

Organising alignment: a case of bridge-building.

Research output: Contribution to Journal/MagazineJournal articlepeer-review

Published
<mark>Journal publication date</mark>2000
<mark>Journal</mark>Organization
Issue number2
Volume7
Number of pages17
Pages (from-to)311-327
Publication StatusPublished
<mark>Original language</mark>English

Abstract

The project of building a bridge is a canonical example of what John Law (1987) has termed `heterogeneous engineering', involving the arrangement of human and nonhuman elements into a stable artifact. This paper reports ethnographic research on the work of civil engineers engaged in designing a bridge scheduled for completion by the year 2004. My emphasis is on a view of bridge-building as persuasive performances that both rely upon and reflexively constitute the elements to be aligned. The work of designing a bridge, on this view, is as much a matter of story-telling as of analysis, calculation, and work with concrete and steel.