Home > Research > Publications & Outputs > A superconducting RF vertical test facility at ...
View graph of relations

A superconducting RF vertical test facility at daresbury laboratory

Research output: Contribution to conference - Without ISBN/ISSN Conference paperpeer-review

Published

Standard

A superconducting RF vertical test facility at daresbury laboratory. / Corlett, P. A.; Bate, R.; Beard, C. D. et al.
2008. 850-852 Paper presented at 11th European Particle Accelerator Conference, EPAC 2008, Genoa, Italy.

Research output: Contribution to conference - Without ISBN/ISSN Conference paperpeer-review

Harvard

Corlett, PA, Bate, R, Beard, CD, Fell, B, Goudket, P, Pattalwar, S, Ambattu, PK, Burt, G, Dexter, AC & Tahir, MI 2008, 'A superconducting RF vertical test facility at daresbury laboratory', Paper presented at 11th European Particle Accelerator Conference, EPAC 2008, Genoa, Italy, 23/06/08 - 27/06/08 pp. 850-852. <http://accelconf.web.cern.ch/AccelConf/e08/papers/mopp125.pdf>

APA

Corlett, P. A., Bate, R., Beard, C. D., Fell, B., Goudket, P., Pattalwar, S., Ambattu, P. K., Burt, G., Dexter, A. C., & Tahir, M. I. (2008). A superconducting RF vertical test facility at daresbury laboratory. 850-852. Paper presented at 11th European Particle Accelerator Conference, EPAC 2008, Genoa, Italy. http://accelconf.web.cern.ch/AccelConf/e08/papers/mopp125.pdf

Vancouver

Corlett PA, Bate R, Beard CD, Fell B, Goudket P, Pattalwar S et al.. A superconducting RF vertical test facility at daresbury laboratory. 2008. Paper presented at 11th European Particle Accelerator Conference, EPAC 2008, Genoa, Italy.

Author

Corlett, P. A. ; Bate, R. ; Beard, C. D. et al. / A superconducting RF vertical test facility at daresbury laboratory. Paper presented at 11th European Particle Accelerator Conference, EPAC 2008, Genoa, Italy.3 p.

Bibtex

@conference{f0740fe69ecb46dda47019b335063d61,
title = "A superconducting RF vertical test facility at daresbury laboratory",
abstract = "A superconducting RF vertical test facility (VTF) has been constructed at Daresbury Laboratory for the testing of superconducting RF cavities at 2K. When fully operational, the facility will be capable of testing a 9-cell 1.3 GHz Tesla type cavity. The facility is initially to be configured to perform phase synchronisation experiments between a pair of single cell 3.9GHz ILC crab cavities. These experiments require the cavities to operate at the same frequency; therefore a tuning mechanism has been integrated into the system. The system is described, and data from the initial operation of the facility is presented.",
author = "Corlett, {P. A.} and R. Bate and Beard, {C. D.} and B. Fell and P. Goudket and S. Pattalwar and Ambattu, {P. K.} and G. Burt and Dexter, {A. C.} and Tahir, {M. I.}",
year = "2008",
month = jan,
day = "1",
language = "English",
pages = "850--852",
note = "11th European Particle Accelerator Conference, EPAC 2008 ; Conference date: 23-06-2008 Through 27-06-2008",

}

RIS

TY - CONF

T1 - A superconducting RF vertical test facility at daresbury laboratory

AU - Corlett, P. A.

AU - Bate, R.

AU - Beard, C. D.

AU - Fell, B.

AU - Goudket, P.

AU - Pattalwar, S.

AU - Ambattu, P. K.

AU - Burt, G.

AU - Dexter, A. C.

AU - Tahir, M. I.

PY - 2008/1/1

Y1 - 2008/1/1

N2 - A superconducting RF vertical test facility (VTF) has been constructed at Daresbury Laboratory for the testing of superconducting RF cavities at 2K. When fully operational, the facility will be capable of testing a 9-cell 1.3 GHz Tesla type cavity. The facility is initially to be configured to perform phase synchronisation experiments between a pair of single cell 3.9GHz ILC crab cavities. These experiments require the cavities to operate at the same frequency; therefore a tuning mechanism has been integrated into the system. The system is described, and data from the initial operation of the facility is presented.

AB - A superconducting RF vertical test facility (VTF) has been constructed at Daresbury Laboratory for the testing of superconducting RF cavities at 2K. When fully operational, the facility will be capable of testing a 9-cell 1.3 GHz Tesla type cavity. The facility is initially to be configured to perform phase synchronisation experiments between a pair of single cell 3.9GHz ILC crab cavities. These experiments require the cavities to operate at the same frequency; therefore a tuning mechanism has been integrated into the system. The system is described, and data from the initial operation of the facility is presented.

M3 - Conference paper

AN - SCOPUS:84899031739

SP - 850

EP - 852

T2 - 11th European Particle Accelerator Conference, EPAC 2008

Y2 - 23 June 2008 through 27 June 2008

ER -