Home > Research > Publications & Outputs > Demand uncertainty and lot sizing in manufactur...

Electronic data

View graph of relations

Demand uncertainty and lot sizing in manufacturing systems: the effects of forecasting errors and mis-specification

Research output: Working paper

Published

Standard

Demand uncertainty and lot sizing in manufacturing systems: the effects of forecasting errors and mis-specification. / Kingsman, B G; Fildes, R A.
Lancaster University: The Department of Management Science, 2005. (Management Science Working Paper Series).

Research output: Working paper

Harvard

Kingsman, BG & Fildes, RA 2005 'Demand uncertainty and lot sizing in manufacturing systems: the effects of forecasting errors and mis-specification' Management Science Working Paper Series, The Department of Management Science, Lancaster University.

APA

Kingsman, B. G., & Fildes, R. A. (2005). Demand uncertainty and lot sizing in manufacturing systems: the effects of forecasting errors and mis-specification. (Management Science Working Paper Series). The Department of Management Science.

Vancouver

Kingsman BG, Fildes RA. Demand uncertainty and lot sizing in manufacturing systems: the effects of forecasting errors and mis-specification. Lancaster University: The Department of Management Science. 2005. (Management Science Working Paper Series).

Author

Kingsman, B G ; Fildes, R A. / Demand uncertainty and lot sizing in manufacturing systems: the effects of forecasting errors and mis-specification. Lancaster University : The Department of Management Science, 2005. (Management Science Working Paper Series).

Bibtex

@techreport{c7a4d20858d647c196a607176d5de5e7,
title = "Demand uncertainty and lot sizing in manufacturing systems: the effects of forecasting errors and mis-specification",
abstract = "This paper proposes a methodology for examining the effect of demand uncertainty and forecast error on lot sizing methods, unit costs and customer service levels in MRP type manufacturing systems. A number of cost structures were considered which depend on the expected time between orders. A simple two-level MRP system where the product is manufactured for stock was then simulated. Stochastic demand for the final product was generated by two commonly occurring processes and with different variances. Various lot sizing rules were then used to determine the amount of product made and the amount of materials bought in. The results confirm earlier research that the behaviour of lot sizing rules is quite different when there is uncertainty in demand compared to the situation of perfect foresight of demand. The best lot sizing rules for the deterministic situation are the worst whenever there is uncertainty in demand. In addition the choice of lot sizing rule between {\textquoteleft}good{\textquoteright} rules such as the EOQ turns out to be relatively less important in reducing unit cost compared to improving forecasting accuracy whatever the cost structure. The effect of demand uncertainty on unit cost for a given service level increases exponentially as the uncertainty in the demand data increases. The paper also shows how the value of improved forecasting can be analysed by examining the effects of different sizes of forecast error in addition to demand uncertainty. In those manufacturing problems with high forecast error variance, improved forecast accuracy should lead to substantial percentage improvements in unit costs.",
keywords = "forecast error / MRP/ lot sizing/ buffer stocks and service levels/ demand uncertainty/ value of forecasting/ manufacturing systems/ forecast mis-specification",
author = "Kingsman, {B G} and Fildes, {R A}",
year = "2005",
language = "English",
series = "Management Science Working Paper Series",
publisher = "The Department of Management Science",
type = "WorkingPaper",
institution = "The Department of Management Science",

}

RIS

TY - UNPB

T1 - Demand uncertainty and lot sizing in manufacturing systems: the effects of forecasting errors and mis-specification

AU - Kingsman, B G

AU - Fildes, R A

PY - 2005

Y1 - 2005

N2 - This paper proposes a methodology for examining the effect of demand uncertainty and forecast error on lot sizing methods, unit costs and customer service levels in MRP type manufacturing systems. A number of cost structures were considered which depend on the expected time between orders. A simple two-level MRP system where the product is manufactured for stock was then simulated. Stochastic demand for the final product was generated by two commonly occurring processes and with different variances. Various lot sizing rules were then used to determine the amount of product made and the amount of materials bought in. The results confirm earlier research that the behaviour of lot sizing rules is quite different when there is uncertainty in demand compared to the situation of perfect foresight of demand. The best lot sizing rules for the deterministic situation are the worst whenever there is uncertainty in demand. In addition the choice of lot sizing rule between ‘good’ rules such as the EOQ turns out to be relatively less important in reducing unit cost compared to improving forecasting accuracy whatever the cost structure. The effect of demand uncertainty on unit cost for a given service level increases exponentially as the uncertainty in the demand data increases. The paper also shows how the value of improved forecasting can be analysed by examining the effects of different sizes of forecast error in addition to demand uncertainty. In those manufacturing problems with high forecast error variance, improved forecast accuracy should lead to substantial percentage improvements in unit costs.

AB - This paper proposes a methodology for examining the effect of demand uncertainty and forecast error on lot sizing methods, unit costs and customer service levels in MRP type manufacturing systems. A number of cost structures were considered which depend on the expected time between orders. A simple two-level MRP system where the product is manufactured for stock was then simulated. Stochastic demand for the final product was generated by two commonly occurring processes and with different variances. Various lot sizing rules were then used to determine the amount of product made and the amount of materials bought in. The results confirm earlier research that the behaviour of lot sizing rules is quite different when there is uncertainty in demand compared to the situation of perfect foresight of demand. The best lot sizing rules for the deterministic situation are the worst whenever there is uncertainty in demand. In addition the choice of lot sizing rule between ‘good’ rules such as the EOQ turns out to be relatively less important in reducing unit cost compared to improving forecasting accuracy whatever the cost structure. The effect of demand uncertainty on unit cost for a given service level increases exponentially as the uncertainty in the demand data increases. The paper also shows how the value of improved forecasting can be analysed by examining the effects of different sizes of forecast error in addition to demand uncertainty. In those manufacturing problems with high forecast error variance, improved forecast accuracy should lead to substantial percentage improvements in unit costs.

KW - forecast error / MRP/ lot sizing/ buffer stocks and service levels/ demand uncertainty/ value of forecasting/ manufacturing systems/ forecast mis-specification

M3 - Working paper

T3 - Management Science Working Paper Series

BT - Demand uncertainty and lot sizing in manufacturing systems: the effects of forecasting errors and mis-specification

PB - The Department of Management Science

CY - Lancaster University

ER -