Home > Research > Publications & Outputs > Economic lot scheduling problem with returns
View graph of relations

Economic lot scheduling problem with returns

Research output: Contribution to Journal/MagazineJournal articlepeer-review

Published

Standard

Economic lot scheduling problem with returns. / Tang, O; Teunter, R H.
In: International Journal of Operations and Production Management, Vol. 15, No. 4, 2006, p. 488-497.

Research output: Contribution to Journal/MagazineJournal articlepeer-review

Harvard

Tang, O & Teunter, RH 2006, 'Economic lot scheduling problem with returns', International Journal of Operations and Production Management, vol. 15, no. 4, pp. 488-497.

APA

Tang, O., & Teunter, R. H. (2006). Economic lot scheduling problem with returns. International Journal of Operations and Production Management, 15(4), 488-497.

Vancouver

Tang O, Teunter RH. Economic lot scheduling problem with returns. International Journal of Operations and Production Management. 2006;15(4):488-497.

Author

Tang, O ; Teunter, R H. / Economic lot scheduling problem with returns. In: International Journal of Operations and Production Management. 2006 ; Vol. 15, No. 4. pp. 488-497.

Bibtex

@article{af80debe64f7442caa63bd1b8102ea9a,
title = "Economic lot scheduling problem with returns",
author = "O Tang and Teunter, {R H}",
year = "2006",
language = "English",
volume = "15",
pages = "488--497",
journal = "International Journal of Operations and Production Management",
issn = "0144-3577",
publisher = "Emerald Group Publishing Ltd.",
number = "4",

}

RIS

TY - JOUR

T1 - Economic lot scheduling problem with returns

AU - Tang, O

AU - Teunter, R H

PY - 2006

Y1 - 2006

M3 - Journal article

VL - 15

SP - 488

EP - 497

JO - International Journal of Operations and Production Management

JF - International Journal of Operations and Production Management

SN - 0144-3577

IS - 4

ER -