Home > Research > Publications & Outputs > Multi-product economic lot scheduling problem w...
View graph of relations

Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing

Research output: Contribution to Journal/MagazineJournal articlepeer-review

Published

Standard

Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing. / Teunter, Ruud; Kaparis, Konstantinos; Tang, Ou.
In: European Journal of Operational Research, Vol. 191, No. 3, 16.12.2008, p. 1241–1253.

Research output: Contribution to Journal/MagazineJournal articlepeer-review

Harvard

APA

Vancouver

Teunter R, Kaparis K, Tang O. Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing. European Journal of Operational Research. 2008 Dec 16;191(3):1241–1253. Epub 2007 Sept 7. doi: 10.1016/j.ejor.2007.08.003

Author

Teunter, Ruud ; Kaparis, Konstantinos ; Tang, Ou. / Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing. In: European Journal of Operational Research. 2008 ; Vol. 191, No. 3. pp. 1241–1253.

Bibtex

@article{1eef216f827f471faeb5cd6acd081008,
title = "Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing",
abstract = "We study the economic lot scheduling problem with two production sources, manufacturing and remanufacturing, for which operations are performed on separate, dedicated lines. We develop an exact algorithm for finding the optimal common-cycle-time policy. The algorithm combines a search for the optimal cycle time with a mixed integer programming (MIP) formulation of the problem given a fixed cycle time. Using case study data from an auto part producer, we perform a sensitivity study on the effects of key problem parameters such as demand rates and return fractions. Furthermore, by comparing to results in Tang and Teunter [Tang, O., Teunter, R.H., 2006. Economic lot scheduling problem with returns.Production and Operations Management] for the situation where all operations are performed on the same line, we analyze the cost benefits of using dedicated lines.",
keywords = "ELSP, Returns , Remanufacturing , Reverse logistics",
author = "Ruud Teunter and Konstantinos Kaparis and Ou Tang",
year = "2008",
month = dec,
day = "16",
doi = "10.1016/j.ejor.2007.08.003",
language = "English",
volume = "191",
pages = "1241–1253",
journal = "European Journal of Operational Research",
issn = "0377-2217",
publisher = "Elsevier Science B.V.",
number = "3",

}

RIS

TY - JOUR

T1 - Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing

AU - Teunter, Ruud

AU - Kaparis, Konstantinos

AU - Tang, Ou

PY - 2008/12/16

Y1 - 2008/12/16

N2 - We study the economic lot scheduling problem with two production sources, manufacturing and remanufacturing, for which operations are performed on separate, dedicated lines. We develop an exact algorithm for finding the optimal common-cycle-time policy. The algorithm combines a search for the optimal cycle time with a mixed integer programming (MIP) formulation of the problem given a fixed cycle time. Using case study data from an auto part producer, we perform a sensitivity study on the effects of key problem parameters such as demand rates and return fractions. Furthermore, by comparing to results in Tang and Teunter [Tang, O., Teunter, R.H., 2006. Economic lot scheduling problem with returns.Production and Operations Management] for the situation where all operations are performed on the same line, we analyze the cost benefits of using dedicated lines.

AB - We study the economic lot scheduling problem with two production sources, manufacturing and remanufacturing, for which operations are performed on separate, dedicated lines. We develop an exact algorithm for finding the optimal common-cycle-time policy. The algorithm combines a search for the optimal cycle time with a mixed integer programming (MIP) formulation of the problem given a fixed cycle time. Using case study data from an auto part producer, we perform a sensitivity study on the effects of key problem parameters such as demand rates and return fractions. Furthermore, by comparing to results in Tang and Teunter [Tang, O., Teunter, R.H., 2006. Economic lot scheduling problem with returns.Production and Operations Management] for the situation where all operations are performed on the same line, we analyze the cost benefits of using dedicated lines.

KW - ELSP

KW - Returns

KW - Remanufacturing

KW - Reverse logistics

U2 - 10.1016/j.ejor.2007.08.003

DO - 10.1016/j.ejor.2007.08.003

M3 - Journal article

VL - 191

SP - 1241

EP - 1253

JO - European Journal of Operational Research

JF - European Journal of Operational Research

SN - 0377-2217

IS - 3

ER -