Home > Research > Publications & Outputs > Scheduling English cricket umpires
View graph of relations

Scheduling English cricket umpires

Research output: Contribution to Journal/MagazineJournal articlepeer-review

Published

Standard

Scheduling English cricket umpires. / Wright, M B.
In: Journal of the Operational Research Society, Vol. 42, No. 6, 1991, p. 447-452.

Research output: Contribution to Journal/MagazineJournal articlepeer-review

Harvard

Wright, MB 1991, 'Scheduling English cricket umpires', Journal of the Operational Research Society, vol. 42, no. 6, pp. 447-452. https://doi.org/10.1057/jors.1991.93

APA

Wright, M. B. (1991). Scheduling English cricket umpires. Journal of the Operational Research Society, 42(6), 447-452. https://doi.org/10.1057/jors.1991.93

Vancouver

Wright MB. Scheduling English cricket umpires. Journal of the Operational Research Society. 1991;42(6):447-452. doi: 10.1057/jors.1991.93

Author

Wright, M B. / Scheduling English cricket umpires. In: Journal of the Operational Research Society. 1991 ; Vol. 42, No. 6. pp. 447-452.

Bibtex

@article{ef95f8cd407c4dcab119a56cc7f074a3,
title = "Scheduling English cricket umpires",
keywords = "sports, scheduling, timetabling, heuristics",
author = "Wright, {M B}",
year = "1991",
doi = "10.1057/jors.1991.93",
language = "English",
volume = "42",
pages = "447--452",
journal = "Journal of the Operational Research Society",
issn = "1476-9360",
publisher = "Taylor and Francis Ltd.",
number = "6",

}

RIS

TY - JOUR

T1 - Scheduling English cricket umpires

AU - Wright, M B

PY - 1991

Y1 - 1991

KW - sports, scheduling, timetabling, heuristics

U2 - 10.1057/jors.1991.93

DO - 10.1057/jors.1991.93

M3 - Journal article

VL - 42

SP - 447

EP - 452

JO - Journal of the Operational Research Society

JF - Journal of the Operational Research Society

SN - 1476-9360

IS - 6

ER -