Home > Research > Publications & Outputs > A cutting stock and scheduling problem in the c...
View graph of relations

A cutting stock and scheduling problem in the copper industry

Research output: Contribution to Journal/MagazineJournal articlepeer-review

Published

Standard

A cutting stock and scheduling problem in the copper industry. / Hendry, L; Fok, K K; Shek, K W.
In: Journal of the Operational Research Society, Vol. 47, No. 1, 1996, p. 38-47.

Research output: Contribution to Journal/MagazineJournal articlepeer-review

Harvard

Hendry, L, Fok, KK & Shek, KW 1996, 'A cutting stock and scheduling problem in the copper industry', Journal of the Operational Research Society, vol. 47, no. 1, pp. 38-47.

APA

Hendry, L., Fok, K. K., & Shek, K. W. (1996). A cutting stock and scheduling problem in the copper industry. Journal of the Operational Research Society, 47(1), 38-47.

Vancouver

Hendry L, Fok KK, Shek KW. A cutting stock and scheduling problem in the copper industry. Journal of the Operational Research Society. 1996;47(1):38-47.

Author

Hendry, L ; Fok, K K ; Shek, K W. / A cutting stock and scheduling problem in the copper industry. In: Journal of the Operational Research Society. 1996 ; Vol. 47, No. 1. pp. 38-47.

Bibtex

@article{fb974365a7fa4815986c8daed7fe7db3,
title = "A cutting stock and scheduling problem in the copper industry",
author = "L Hendry and Fok, {K K} and Shek, {K W}",
year = "1996",
language = "English",
volume = "47",
pages = "38--47",
journal = "Journal of the Operational Research Society",
issn = "1476-9360",
publisher = "Taylor and Francis Ltd.",
number = "1",

}

RIS

TY - JOUR

T1 - A cutting stock and scheduling problem in the copper industry

AU - Hendry, L

AU - Fok, K K

AU - Shek, K W

PY - 1996

Y1 - 1996

M3 - Journal article

VL - 47

SP - 38

EP - 47

JO - Journal of the Operational Research Society

JF - Journal of the Operational Research Society

SN - 1476-9360

IS - 1

ER -