Construction status and prospects of the Hyper-Kamiokande project

Research output: Contribution to Journal/MagazineConference articlepeer-review

Published

Standard

Construction status and prospects of the Hyper-Kamiokande project. / Hyper-Kamiokande Collaboration.
In: Proceedings of Science, Vol. 395, 1192, 18.03.2022.

Research output: Contribution to Journal/MagazineConference articlepeer-review

Harvard

Hyper-Kamiokande Collaboration 2022, 'Construction status and prospects of the Hyper-Kamiokande project', Proceedings of Science, vol. 395, 1192. https://doi.org/10.22323/1.395.1192

APA

Hyper-Kamiokande Collaboration (2022). Construction status and prospects of the Hyper-Kamiokande project. Proceedings of Science, 395, Article 1192. https://doi.org/10.22323/1.395.1192

Vancouver

Hyper-Kamiokande Collaboration. Construction status and prospects of the Hyper-Kamiokande project. Proceedings of Science. 2022 Mar 18;395:1192. Epub 2021 Aug 1. doi: 10.22323/1.395.1192

Author

Hyper-Kamiokande Collaboration. / Construction status and prospects of the Hyper-Kamiokande project. In: Proceedings of Science. 2022 ; Vol. 395.

Bibtex

@article{c5cd65ab6e844103882b09976764c853,
title = "Construction status and prospects of the Hyper-Kamiokande project",
abstract = "The Hyper-Kamiokande project is a 258-kton Water Cherenkov together with a 1.3-MW high-intensity neutrino beam from the Japan Proton Accelerator Research Complex (J-PARC). The inner detector with 186-kton fiducial volume is viewed by 20-inch photomultiplier tubes (PMTs) and multi-PMT modules, and thereby provides state-of-the-art of Cherenkov ring reconstruction with thresholds in the range of few MeVs. The project is expected to lead to precision neutrino oscillation studies, especially neutrino CP violation, nucleon decay searches, and low energy neutrino astronomy. In 2020, the project was officially approved and construction of the far detector was started at Kamioka. In 2021, the excavation of the access tunnel and initial mass production of the newly developed 20-inch PMTs was also started. In this paper, we present a basic overview of the project and the latest updates on the construction status of the project, which is expected to commence operation in 2027.",
author = "{Hyper-Kamiokande Collaboration} and Yoshitaka Itow and K. Abe and P. Adrich and H. Aihara and R. Akutsu and I. Alekseev and A. Ali and {Alj Hakim}, {Y. I.} and F. Ameli and Anthony, {L. H.V.} and A. Araya and Y. Asaoka and V. Aushev and F. Ballester and I. Bandac and M. Barbi and G. Barr and M. Batkiewicz-Kwasniak and M. Bellato and V. Berardi and L. Bernard and E. Bernardini and L. Berns and S. Bhadra and J. Bian and A. Blanchet and A. Blondel and A. Boiano and S. Bolognesi and L. Bonavera and N. Booth and S. Bordoni and S. Borjabad and T. Boschi and D. Bose and Boyd, {S. B.} and C. Bozza and A. Bravar and C. Bronner and L. Brown and A. Bubak and A. Buchowicz and {Buizza Avanzini}, M. and Cafagna, {F. S.} and Calabria, {N. F.} and T. Dealtry and Doyle, {T. A.} and A. Finch and Kormos, {L. L.} and {Lamers James}, M.",
note = "Funding Information: The REWIND trial was sponsored and funded by Eli Lilly and Company and led by an international steering committee that was coordinated by the Population Health Research Institute (Hamilton, ON, Canada), which also analysed the data for this report after the database was locked. ICON Clinical Research managed study sites and obtained data. Scientists employed by the funder were on the REWIND steering committee and contributed to trial design, trial implementation, and data interpretation. All authors and the sponsor jointly made the decision to submit for publication. The corresponding author had full access to all data in the study and had final responsibility for the decision to submit for publication. Publisher Copyright: {\textcopyright} Copyright owned by the author(s).; 37th International Cosmic Ray Conference, ICRC 2021 ; Conference date: 12-07-2021 Through 23-07-2021",
year = "2022",
month = mar,
day = "18",
doi = "10.22323/1.395.1192",
language = "English",
volume = "395",
journal = "Proceedings of Science",
issn = "1824-8039",
publisher = "Sissa Medialab Srl",

}

RIS

TY - JOUR

T1 - Construction status and prospects of the Hyper-Kamiokande project

AU - Hyper-Kamiokande Collaboration

AU - Itow, Yoshitaka

AU - Abe, K.

AU - Adrich, P.

AU - Aihara, H.

AU - Akutsu, R.

AU - Alekseev, I.

AU - Ali, A.

AU - Alj Hakim, Y. I.

AU - Ameli, F.

AU - Anthony, L. H.V.

AU - Araya, A.

AU - Asaoka, Y.

AU - Aushev, V.

AU - Ballester, F.

AU - Bandac, I.

AU - Barbi, M.

AU - Barr, G.

AU - Batkiewicz-Kwasniak, M.

AU - Bellato, M.

AU - Berardi, V.

AU - Bernard, L.

AU - Bernardini, E.

AU - Berns, L.

AU - Bhadra, S.

AU - Bian, J.

AU - Blanchet, A.

AU - Blondel, A.

AU - Boiano, A.

AU - Bolognesi, S.

AU - Bonavera, L.

AU - Booth, N.

AU - Bordoni, S.

AU - Borjabad, S.

AU - Boschi, T.

AU - Bose, D.

AU - Boyd, S. B.

AU - Bozza, C.

AU - Bravar, A.

AU - Bronner, C.

AU - Brown, L.

AU - Bubak, A.

AU - Buchowicz, A.

AU - Buizza Avanzini, M.

AU - Cafagna, F. S.

AU - Calabria, N. F.

AU - Dealtry, T.

AU - Doyle, T. A.

AU - Finch, A.

AU - Kormos, L. L.

AU - Lamers James, M.

N1 - Funding Information: The REWIND trial was sponsored and funded by Eli Lilly and Company and led by an international steering committee that was coordinated by the Population Health Research Institute (Hamilton, ON, Canada), which also analysed the data for this report after the database was locked. ICON Clinical Research managed study sites and obtained data. Scientists employed by the funder were on the REWIND steering committee and contributed to trial design, trial implementation, and data interpretation. All authors and the sponsor jointly made the decision to submit for publication. The corresponding author had full access to all data in the study and had final responsibility for the decision to submit for publication. Publisher Copyright: © Copyright owned by the author(s).

PY - 2022/3/18

Y1 - 2022/3/18

N2 - The Hyper-Kamiokande project is a 258-kton Water Cherenkov together with a 1.3-MW high-intensity neutrino beam from the Japan Proton Accelerator Research Complex (J-PARC). The inner detector with 186-kton fiducial volume is viewed by 20-inch photomultiplier tubes (PMTs) and multi-PMT modules, and thereby provides state-of-the-art of Cherenkov ring reconstruction with thresholds in the range of few MeVs. The project is expected to lead to precision neutrino oscillation studies, especially neutrino CP violation, nucleon decay searches, and low energy neutrino astronomy. In 2020, the project was officially approved and construction of the far detector was started at Kamioka. In 2021, the excavation of the access tunnel and initial mass production of the newly developed 20-inch PMTs was also started. In this paper, we present a basic overview of the project and the latest updates on the construction status of the project, which is expected to commence operation in 2027.

AB - The Hyper-Kamiokande project is a 258-kton Water Cherenkov together with a 1.3-MW high-intensity neutrino beam from the Japan Proton Accelerator Research Complex (J-PARC). The inner detector with 186-kton fiducial volume is viewed by 20-inch photomultiplier tubes (PMTs) and multi-PMT modules, and thereby provides state-of-the-art of Cherenkov ring reconstruction with thresholds in the range of few MeVs. The project is expected to lead to precision neutrino oscillation studies, especially neutrino CP violation, nucleon decay searches, and low energy neutrino astronomy. In 2020, the project was officially approved and construction of the far detector was started at Kamioka. In 2021, the excavation of the access tunnel and initial mass production of the newly developed 20-inch PMTs was also started. In this paper, we present a basic overview of the project and the latest updates on the construction status of the project, which is expected to commence operation in 2027.

U2 - 10.22323/1.395.1192

DO - 10.22323/1.395.1192

M3 - Conference article

AN - SCOPUS:85144594383

VL - 395

JO - Proceedings of Science

JF - Proceedings of Science

SN - 1824-8039

M1 - 1192

T2 - 37th International Cosmic Ray Conference, ICRC 2021

Y2 - 12 July 2021 through 23 July 2021

ER -