Exploring the Six Sigma phenomenon using multiple case study evidence

Research output: Working paper

Published

Standard

Exploring the Six Sigma phenomenon using multiple case study evidence. / Nonthaleerak, P; Hendry, L.
Lancaster University: The Department of Management Science, 2005. (Management Science Working Paper Series).

Research output: Working paper

Harvard

Nonthaleerak, P & Hendry, L 2005 'Exploring the Six Sigma phenomenon using multiple case study evidence' Management Science Working Paper Series, The Department of Management Science, Lancaster University.

APA

Nonthaleerak, P., & Hendry, L. (2005). Exploring the Six Sigma phenomenon using multiple case study evidence. (Management Science Working Paper Series). The Department of Management Science.

Vancouver

Nonthaleerak P, Hendry L. Exploring the Six Sigma phenomenon using multiple case study evidence. Lancaster University: The Department of Management Science. 2005. (Management Science Working Paper Series).

Author

Nonthaleerak, P ; Hendry, L. / Exploring the Six Sigma phenomenon using multiple case study evidence. Lancaster University : The Department of Management Science, 2005. (Management Science Working Paper Series).

Bibtex

@techreport{a031a7d8fe244c6785a80e3359e787b9,
title = "Exploring the Six Sigma phenomenon using multiple case study evidence",
abstract = "Empirical evidence is presented from 11 case study companies, from which 43 employee interview transcripts were analyzed along with company documents. All the companies have experience of Six Sigma, but with varying levels of progress and success. The business types are varied, including manufacturers, sales and service companies and a national airline. The research questions aim to identify areas of weakness in the Six Sigma methodology that require enhancement; to determine any issues or difficulties associated with the implementation process and how they differ between manufacturing and service processes; to add to the current literature on the Critical Success Factors and to study the effect of national culture in an Asian environment. Key findings include: (i) whilst the Six Sigma phenomenon is generally perceived positively, it is concluded that Six Sigma is more appropriate for high risk, complicated, large scale and cross functional projects and cannot be cost justified for smaller projects; (ii) the Six Sigma methodology needs to be enhanced to ensure that projects are aligned to company goals as the evidence suggests that Six Sigma is less successful if it is too much geared towards shortsighted financial targets that do not have management buy-in; (iii) the evidence questions standard text book advice that a {\textquoteleft}Black Belt{\textquoteright} (BB) should have a full time role, suggesting that a part-time BB role can be a more realistic option particularly in a small company and (iv) the training materials available need to be improved to be more appropriate for service operations.",
keywords = "Six Sigma, empirical research, process improvement",
author = "P Nonthaleerak and L Hendry",
year = "2005",
language = "English",
series = "Management Science Working Paper Series",
publisher = "The Department of Management Science",
type = "WorkingPaper",
institution = "The Department of Management Science",

}

RIS

TY - UNPB

T1 - Exploring the Six Sigma phenomenon using multiple case study evidence

AU - Nonthaleerak, P

AU - Hendry, L

PY - 2005

Y1 - 2005

N2 - Empirical evidence is presented from 11 case study companies, from which 43 employee interview transcripts were analyzed along with company documents. All the companies have experience of Six Sigma, but with varying levels of progress and success. The business types are varied, including manufacturers, sales and service companies and a national airline. The research questions aim to identify areas of weakness in the Six Sigma methodology that require enhancement; to determine any issues or difficulties associated with the implementation process and how they differ between manufacturing and service processes; to add to the current literature on the Critical Success Factors and to study the effect of national culture in an Asian environment. Key findings include: (i) whilst the Six Sigma phenomenon is generally perceived positively, it is concluded that Six Sigma is more appropriate for high risk, complicated, large scale and cross functional projects and cannot be cost justified for smaller projects; (ii) the Six Sigma methodology needs to be enhanced to ensure that projects are aligned to company goals as the evidence suggests that Six Sigma is less successful if it is too much geared towards shortsighted financial targets that do not have management buy-in; (iii) the evidence questions standard text book advice that a ‘Black Belt’ (BB) should have a full time role, suggesting that a part-time BB role can be a more realistic option particularly in a small company and (iv) the training materials available need to be improved to be more appropriate for service operations.

AB - Empirical evidence is presented from 11 case study companies, from which 43 employee interview transcripts were analyzed along with company documents. All the companies have experience of Six Sigma, but with varying levels of progress and success. The business types are varied, including manufacturers, sales and service companies and a national airline. The research questions aim to identify areas of weakness in the Six Sigma methodology that require enhancement; to determine any issues or difficulties associated with the implementation process and how they differ between manufacturing and service processes; to add to the current literature on the Critical Success Factors and to study the effect of national culture in an Asian environment. Key findings include: (i) whilst the Six Sigma phenomenon is generally perceived positively, it is concluded that Six Sigma is more appropriate for high risk, complicated, large scale and cross functional projects and cannot be cost justified for smaller projects; (ii) the Six Sigma methodology needs to be enhanced to ensure that projects are aligned to company goals as the evidence suggests that Six Sigma is less successful if it is too much geared towards shortsighted financial targets that do not have management buy-in; (iii) the evidence questions standard text book advice that a ‘Black Belt’ (BB) should have a full time role, suggesting that a part-time BB role can be a more realistic option particularly in a small company and (iv) the training materials available need to be improved to be more appropriate for service operations.

KW - Six Sigma

KW - empirical research

KW - process improvement

M3 - Working paper

T3 - Management Science Working Paper Series

BT - Exploring the Six Sigma phenomenon using multiple case study evidence

PB - The Department of Management Science

CY - Lancaster University

ER -