TY - JOUR
T1 - Integrating load-based order release and priority dispatching
AU - Land, Martin
AU - Stevenson, Mark
AU - Thurer, Matthias
PY - 2014
Y1 - 2014
N2 - Workload control (WLC) is a well-established production control concept for job shops that put primary emphasis on load-based order release. Recent advances in load-based order release research have led to an improved delivery performance at reduced shop floor workloads. But although order release is the primary focus of WLC research, it must be coupled with priority dispatching on the shop floor if order progress is to be regulated. Prior simulation research suggests that load-based order release methods should only be coupled with simple dispatching rules because other, more powerful rules can conflict with the functioning of the release method. Yet, recent empirical research suggests that powerful priority dispatching rules – such as due date-oriented dispatching rules – are in fact needed for a high level of delivery performance to be obtained in practice. This paper focuses on overcoming the conflict between order release and dispatching, so load-based order release can be combined with due date-oriented dispatching. Preliminary analysis reveals that part of the conflict is because existing due date-oriented dispatching rules overcompensate for schedule deviations that occur when orders are either released earlier or later than planned. Two alternative new dispatching rules based on an improved method of determining operation due dates are then developed to better account for schedule deviations and overcome the conflict with load-based order release. Further improvements in delivery performance are obtained, while the large workload reductions achieved by recently developed load-based order release methods are retained.
AB - Workload control (WLC) is a well-established production control concept for job shops that put primary emphasis on load-based order release. Recent advances in load-based order release research have led to an improved delivery performance at reduced shop floor workloads. But although order release is the primary focus of WLC research, it must be coupled with priority dispatching on the shop floor if order progress is to be regulated. Prior simulation research suggests that load-based order release methods should only be coupled with simple dispatching rules because other, more powerful rules can conflict with the functioning of the release method. Yet, recent empirical research suggests that powerful priority dispatching rules – such as due date-oriented dispatching rules – are in fact needed for a high level of delivery performance to be obtained in practice. This paper focuses on overcoming the conflict between order release and dispatching, so load-based order release can be combined with due date-oriented dispatching. Preliminary analysis reveals that part of the conflict is because existing due date-oriented dispatching rules overcompensate for schedule deviations that occur when orders are either released earlier or later than planned. Two alternative new dispatching rules based on an improved method of determining operation due dates are then developed to better account for schedule deviations and overcome the conflict with load-based order release. Further improvements in delivery performance are obtained, while the large workload reductions achieved by recently developed load-based order release methods are retained.
KW - workload control
KW - order release
KW - priority dispatching
KW - job shop
U2 - 10.1080/00207543.2013.836614
DO - 10.1080/00207543.2013.836614
M3 - Journal article
VL - 52
SP - 1059
EP - 1073
JO - International Journal of Production Research
JF - International Journal of Production Research
SN - 0020-7543
IS - 4
ER -