Home > Research > Publications & Outputs > Update on Bmad Simulations From Target to Stora...

Associated organisational units

Links

Text available via DOI:

View graph of relations

Update on Bmad Simulations From Target to Storage Ring for the New Muon G-2 Experiment at Fermilab

Research output: Contribution in Book/Report/Proceedings - With ISBN/ISSNConference contribution/Paperpeer-review

Published
Close
Publication date1/06/2017
Host publicationIPAC 2017 Proceedings of the 8th International Particle Accelerator Conference
EditorsGianluigi Arduini, Mats Lindroos, Juliana Pranke, Volker R. W. Schaa, Mike Seidel
PublisherJACoW
ISBN (electronic)9783954501823
<mark>Original language</mark>English
EventIPAC 2017: 8th International Particle Accelerator Conference - Bella Center, Copenhagen, Denmark
Duration: 14/05/201719/05/2017
https://ipac17.org/

Conference

ConferenceIPAC 2017
Country/TerritoryDenmark
CityCopenhagen
Period14/05/1719/05/17
Internet address

Conference

ConferenceIPAC 2017
Country/TerritoryDenmark
CityCopenhagen
Period14/05/1719/05/17
Internet address

Abstract

The new muon g-2 experiment at Fermilab (E989) aims to measure the anomalous magnetic moment of the muon to an uncertainty of 140 ppb. The existing accelerator facility at Fermilab is being adapted to the requirements of the g-2 experiment and the baseline lattice design is now established. This paper presents the results of beam simulations and spin tracking carried out using the Bmad software package for the g-2 beam transport system, including a variant which bypasses the delivery ring as proposed for the beam commissioning.